單元四:AI 安全——風險管理角度
Module 4: AI Safety — A Risk Management Perspective · 建議 2 小時
4.1 模型與供應商風險評估 4.1 Model and Vendor Risk Assessment
- 了解AI供應商嘅數據處理條款:資料會唔會用作訓練、保留幾耐、由邊個處理(有冇分包商/subprocessor)。
Understand the AI vendor's data-handling terms: will your data be used for training, how long is it retained, and who processes it (any subprocessors)?
- 查閱供應商有冇獨立認證或審計報告(如安全認證),作為盡職審查一部分。
Check whether the vendor holds independent certifications or audit reports (e.g. security certifications) as part of vendor due diligence.
- 評估供應商集中風險:過度依賴單一AI工具處理關鍵流程,一旦服務中斷嘅影響。
Assess vendor concentration risk: the impact if a single AI tool that key processes depend on becomes unavailable.
4.2 財務資料特有嘅風險 4.2 Risks Specific to Financial Data
| 風險 Risk | 說明 Explanation |
|---|---|
| 資料外洩 Data leakage | 將客戶財務或個人資料貼入無管治嘅AI工具,脫離機構掌控 Pasting client financial or personal data into an ungoverned AI tool, outside organisational control |
| 幻覺導致誤報 Hallucination causing misstatement | AI編造睇落合理嘅數字或條款,若未經核實直接採用會導致報表錯誤 The AI fabricates plausible-looking figures or terms — using them unverified can cause a misstatement |
| 版本漂移 Version drift | 唔同時間、唔同工具畀出唔同答案,缺乏一致性同可追溯性 Different tools or points in time give different answers, undermining consistency and traceability |
4.3 變更管理與版本控制 4.3 Change Management and Version Control
- 記錄邊個AI工具、邊個版本、喺邊個日期用於邊項工作,方便日後追溯問題源頭。
Record which AI tool, which version, and on what date was used for which task, so any issue can be traced back.
- AI建立或修改嘅公式,經人手覆核確認後先正式採用,並記錄核准人。
Formulas built or modified by AI go into use only after human review and confirmation, with the approver recorded.
4.4 事故應變 4.4 Incident Response
- 發現AI輸出有誤或懷疑資料外洩,即時停止使用該提示詞/工具,並保留相關記錄。
On discovering incorrect AI output or a suspected data leak, immediately stop using that prompt/tool and preserve the relevant records.
- 評估影響範圍:受影響嘅客戶、報表期間或交易有幾多。
Assess the scope of impact: which clients, reporting periods or transactions are affected.
- 按機構政策向主管/資訊保安負責人匯報,並視乎情況考慮是否需要按PDPO匯報私隱專員公署(見單元五)。
Report to your supervisor/information security lead per organisational policy, and consider whether a PDPO notification to the PCPD is needed (see Module 5).
- 事後檢討:修正提示詞、工具使用範圍或內部政策,避免同類事件重演。
Post-incident review: revise the prompt, the tool's scope of use, or internal policy to prevent recurrence.
SAMPLE 練習 · 供應商風險+事故四步
Peakview(SAMPLE)計劃將銀行對賬交給新公模 AI。請列出至少三項供應商盡職審查問題,並寫出發現幻覺誤報時嘅事故四步。
參考答案(點擊展開)
- 盡職:資料會否訓練、保留期、分包商、認證/審計報告、集中風險。
- 事故:①即停用並留紀錄 ②評估影響範圍 ③按政策匯報(必要時 PDPO/PCPD) ④事後修正提示詞/政策。